FOUKA (Algeria) Water pipeline remote control

Market : Water & Utilities
Client : ADE, main contractor CMC
Area : FOUKA
Service : System Integration e OEM
The water, taken from the sea, desalinated and made drinking water enter into the duct in the distribution network. The supply is composed of about 20 km of fiber needed to create a loop for the communication system, a control center full of redundant scada servers, server for the management of historical data and two client stations.
We manage, 4 stations at the same number of tanks and two stations at the desalination plant.
On each RTU is a Panel PC with SCADA station as local operator pstation. We also realized the voip communication network with its delivery of mobile VoIP (both industrial and office) and the PBX. Besides the supply and installation of fiber optic components and hardware we developped the scada synoptic pages and the system automation logic. We managed about 2000 points of I / O

 
 

FOUKA (Algeria) Water pipeline remote control
FOUKA (Algeria) Water pipeline remote control
FOUKA (Algeria) Water pipeline remote control